The Gold Bar Mine Complex is an open-pit, heap-leach gold mine on Nevada’s Cortez Trend

Q2 2026 results, Aug 5, 2026; release, Jul 22, 2026; McEwen fact sheet, Sept 2026.
Gold and silverCopper

Nevada
McEwen plans 30,000 to 33,000 gold equivalent ounces here in 2026
McEwen reduced the 2026 guidance from 39,000-43,000 GEO on Aug 5, 2026. Gold Bar produced 13,726 GEO in the first half. Cash costs are planned at US$2,650-2,950 and all-in sustaining costs at US$2,900-3,200 per GEO. McEwen expects 90,000-110,000 GEO by 2030.
Q2 2026 results, Aug 5, 2026. Forward-looking; see the cautionary statement.
Lookout Mountain and Windfall hold 629,800 ounces Indicated
The two deposits also hold 262,000 ounces Inferred. McEwen filed their NI 43-101 technical report on Jul 22, 2026.
McEwen is drilling 36 km here in 2026
The 2026 exploration budget is US$10 million.
McEwen fact sheet, Sept 2026.
Resources and reserves
| Deposit | Category | Grade | Contained |
|---|---|---|---|
| Gold Bar | Probable reserve | 0.61 g/t | 168,000 oz |
| Gold Bar Mine | Indicated | 0.52 g/t | 162,000 oz |
| Gold Bar Mine | Inferred | 0.43 g/t | 19,000 oz |
| Lookout Mountain | Indicated | 0.64 g/t | 402,000 oz |
| Lookout Mountain | Inferred | 0.57 g/t | 134,000 oz |
| Windfall | Indicated | 0.75 g/t | 227,500 oz |
| Windfall | Inferred | 1.53 g/t | 127,800 oz |
| Total Gold Bar Complex | Indicated | 0.64 g/t | 791,500 oz |
| Total Gold Bar Complex | Inferred | 0.78 g/t | 280,800 oz |
As of Dec 31, 2025 (S-K 1300), resources exclusive of reserves: McEwen’s Reserves and Resources page.
Qualified persons: Channa Kumarage, P.Eng., Vice President, Operations (technical contents, including reserves) and Luke Willis, P.Geo., Director of Resource Modelling (resources), both Qualified Persons as defined by SEC S-K 1300 and NI 43-101 (presentation, Sept 2026, slide 2). Resources are exclusive of reserves. See the cautionary statement.