Operations
Six operations and projects in four countries
Gold and silverCopper


Fox Complex
20,000-23,000 GEO planned in 2026. The Stock Mine starts in Q4 2026; Grey Fox runs the complex to 2041.

Tartan
308,900 oz Indicated and 302,700 oz Inferred (March 2026).

Gold Bar Mine Complex
30,000-33,000 GEO planned in 2026, with 36 km of drilling.

El Gallo
Construction began in September 2026; production is targeted for the second half of 2027.

Los Azules
10.2 billion pounds of copper reserves and a 21-year mine life. McEwen owns 46.3% through McEwen Copper.

San José
59,000-64,000 GEO to McEwen in 2026; a US$49.4 million dividend in May.
2026 plans: Q2 2026 results, Aug 5, 2026. Tartan: release, Mar 23, 2026. El Gallo: release, Oct 9, 2026. Los Azules: Los Azules Feasibility Study release, Oct 7, 2025. San José dividend: release, May 21, 2026.
